News Center
-
WENZHOU, 11 May 2026: A delegation from SONABEL (Société Nationale d'Électricité du Burkina Faso), Burkina Faso's national electricity authority, recently visited our company (Zhejiang Junwei Electric Co., Ltd.) to conduct specialized performance testing on the PG series circuit breakers. The comprehensive tests validated the reliability, durability, and adaptability of the products, further solidifying the longstanding partnership and mutual trust between the two organizations.
The Burkina Faso delegation visited Junwei Electric Laboratory on Monday, May 11, 2026.
Over the past 10 years, Junwei Electric has been a key partner in the development of Burkina Faso's power infrastructure. A variety of our power equipment has been successfully integrated into the local transmission and distribution network, playing a crucial role in ensuring stable and reliable electricity supply across the region.
The delegation of Burkina Faso is testing the mechanical life of the PG 2P&4P circuit breaker, Monday, May 11, 2026.
During the testing process, technical teams from both sides collaborated closely, adhering to international power equipment testing standards as well as the specific operational requirements of Burkina Faso's power system. Core performance indicators—including insulation resistance, switching capacity, mechanical endurance, and temperature-rise characteristics—were rigorously evaluated.
Our professional testing team provided full technical support, operating specialized equipment such as short-circuit generator test systems and mechanical life test benches while recording real-time data to ensure a rigorous, professional, and fully traceable process.
The circuit breakers performed well across the board, in some tests going beyond standard benchmarks even under demanding simulated conditions. The SONABEL delegation took note of this.
"This testing fully verifies the strong quality of your products and reinforces our confidence in deepening cooperation," the delegation stated, emphasizing the strengthened partnership between the two organizations.
This successful collaboration highlights Junwei Electric's continued commitment to providing dependable power solutions and supporting the sustainable development of Burkina Faso's electricity infrastructure.
-
This June, in the thick of summer, we're sending another shipment to Burkina Faso in Africa, on its way to Ouagadougou. We've kept up a solid pace with our exports and continue to strengthen our footprint across the African market.
Yesterday we wrapped up final checks and full container packing for meter boxes, fuses, circuit breakers, wiring clamps, and other finished products. Everything was loaded onto the trucks smoothly and is now ready for departure.
This order shows that our overseas partner really appreciates our product quality, our ability to deliver in volume, and the full range of one-stop support we provide.
Thanks to our reliable product standards and wide product lineup, plus a solid and compliant supply chain with stable overseas channels, we keep a close eye on every link — inspection, logistics, and shipping — to make sure the goods arrive overseas on time and in good shape.